Index > Industry > Bi-directional Load Test >

Sales & Service of Super-Cell for Bi-directional Load Test

自平衡荷载箱Super-Cell制造、研发和技术服务

info@ougangroup.com

The Hangzhou Bay Bridge

[2014-11-23]
Hangzhou Bay Bridge project was started on 14th Nov., 2003, completed on 26th June 2007, and open on 1st May, 2008. Hangzhou Bay Bridge is a cross-sea bridge over Hangzhou bay China. Its north is from Jiaxing Haiyan Zhengjiadai and south to Ningbo Cixi Shuiluwan, the total length is 36km, and become the third longest cross-sea bridge in the world after American Lake Pontchartrain Causeway and Qindao Jiaozhou Bay Bridge. 
Ougan participated in the installation and BDSLT for pile with 2.2m diameter and ultimate load capacity 7000ton. 
1. Load cell on jobsite 

2. Strain gauge

3 Lower reinforcement cage 

4 Design sketch of bridge
Service hotline:400-0885-135
Copyright @ 2020 All Rights Reserved. Powered
LIKN:piling rig rotary drill rig rock auger

浙公网安备 33010502004484号