The Yushan Bridge Project was designed so that the existing road in Ningbo city’s Zhoushan Harbour would have a branch road. The extension bridge will connect the Daishan Island, to the renowned Yushan International Green Petrochemical Headquarters.
The overall length of this branch road will be 8815 meters long and with 7781.75 meters of the total suspended as a bridge.
After several rounds of rigorous screening, Ougan Technology was honoured to have provided bi-directional static load testing equipment and service to this project.
Pile testing overview:
|
Single pile testing load
|
Pile diameter
|
Pile length
|
Pile one
|
70 000 kN (15 737 kip)
|
3.4 m (134in)
|
145 m (476ft)
|
Pile two
|
120 000 kN (26 977kip)
|
3.8 m (150in)
|
139 m (456ft)
|
Pile three
|
70 000 kN (15 737kip)
|
4.0 m (158in)
|
47 m (154ft)
|
Pile four
|
120 000 kN (26 977kip)
|
4.0 m (158in)
|
139 m (456ft)
|