The Manila MRT Line 7 is an under construction rapid transit line in the Philippines. When completed, the line will be 22.8 kilometers long serviced by 14 stations.
The project broke ground on April 20, 2016 and its target completion is by April 2020. After the completion of this project, 350,000 passengers will benefit from the rail transit every day.
In 2017, the Bi-directional static load testing was conducted by us with our patented Super-cell technology.
Single Pile Testing load: 9,000kN/4,000kN/7,200kN (2,023kip/899kip/1,619kip)
Pile diameter: 1m/1m/1.5m (39.4in/39.4in/59in)