Ougan Group had successfully provided load cell assembly and bi-directional static load test services for the Hongxi Bridge project in Wenzhou.
The Hongxi Bridge is part of an expressway still undergoing construction, that will connect the Wenzhou towns of Wencheng and Taishun. The bridge crosses the Hongxi stream and lies in a steep valley. According to the preliminary design, this bridge adopts the high span pre-stressed concrete tower cable-stayed bridge, and the maximum pier under the beam bottom is 121.012 - 126.012 m.
When it is completed, the Hongxi Bridge will become the second highest bridge in Eastern China with a deck of approximately 192 m (627 ft) high.
Pile testing overview:
Pile diameter
|
Single pile testing load
|
Pile depth
|
Location of Super Cell from the surface
|
2500mm(98inch)
|
90,000kN(20,200kip)
|
25m(82feet)
|
24m(78.7feet)
|