The Linyi North Station of The Luann High-Speed Railway in The Shandong Province of China

[2018-09-04]
Recently Ougan Technology successfully performed a complete load test service using the Super Cell in the Linyi North Station of the high-speed railway. The total length of this rail line when completed will be 494 kilometers with an investment of more than 10 billion US dollars. The double-track line for passenger transportation will have a cruising speed of 350 km/h.

The Linyi North Station is one of the most important and largest stations on this railway. The station covers an area of approximately 100,000 square meters. The station will consist of a four-story building that will include offices, shopping, restaurants as well as the usual waiting floor and platform floor.

The Linyi North Station project was launched in August of 2016 with construction officially beginning on December 13, 2017. Upon completion there will be four high-speed rail lines interconnected at The Linyi North Station. This massive transport hub will integrate high-speed rail, subway, urban bus and taxi; pushing forward the ideals of “seamless connection” and “zero-distance transfer” in modern transportation hubs. 
 
The testing pile overview:
Pile diameter Single pile testing load Pile length
1200mm(47in) 22000kN(4,940kip) 50m(164ft)




Weld Super Cell to the reinforcement cage
Load the load cell by hydraulic pump and read the data